Undercounter Water Boiler Installation
- This installation requires a 13 Amp plug socket within 1 metre of proposed siting of the water boiler. Access through the worktop into the under counter siting of the boiler is also required
- Please check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information
- Due to the wide variety of materials used for counters, it is recommended that any access holes are pre-cut before installation is arranged
- A plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler
- The services for any under counter boilers must be easily accessible
Description
Specifications
Lead Time
7-10 days
Brand
Non Branded
Categories
Root
Category
Spares and Accessories
